Page last updated Apr 15, 2016 @ 06:46pm

Automatic Transfer Switches - Single Phase

Cummins Onan generator discount coupon
Click above to redeem coupon

These switches are for use with the automatic standby generators we sell (or in some cases portable generators) 
and should be installed by a qualified electrician or electrical contractor.  Local permits may be required.
Remember that the transfer switch current rating must be at least high enough to carry full rated load of your
generator.  It also must match or exceed the current rating of the upstream breaker or fuse protection that will
supply normal utility power.  Most jurisdictions do not require the transfer device to switch the neutral.  Therefore
these prices do not include the extra pole for that purpose.  If your local codes or application requires the neutral to
be switched contact us for a special quote.  We can also provide custom enclosures to house these switches if you
have harsh environments.

table-arrow.gif (695 bytes)

Description

Battery Charger Svc Ent Rated Discon. Manage Loads Works with

Price
$ US

RLC1SXJ20100
RLC1SEJ20100
Automatic Transfer Switch - Eaton C-H, 100 Amp, 240V, exerciser no optional aux relay optional any automatic standby generator rated 120/240VAC with 2 wire start control starts at
$897
RLC1SXJ20200
RLC1SEJ20200
Automatic Transfer Switch - Eaton C-H, 200 Amp, 240V, exerciser starts at
$1,211
EGSU100..
EGSU150..
EGSU200..
EGSU400..
Green Automatic Transfer Switch - Eaton C-H, 100-400 Amp, 240V, exerciser, load management, service disconnect option no optional yes any automatic standby generator rated 120/240VAC with 2 wire start control starts at
$737
RSS100 Automatic Transfer Switch - Cummins Power Generation, 100 Amp, 240V yes no no any automatic standby generator rated 120/240VAC with 2 wire start control $548
free freight
RSS200 Automatic Transfer Switch - Cummins Power Generation, 200 Amp, 240V $756
free freight
MGVATS1001240 Automatic Transfer Switch - Milbank, 100 amp, 240V, exerciser, 5 year warranty standard no no no any automatic standby generator rated 120/240VAC single phase with 2 wire start control $760
MGVATS2001240 Automatic Transfer Switch - Milbank, 200 amp, 240V, exerciser, 5 year warranty standard $954
MGVATS4001240 Automatic Transfer Switch - Milbank, 400 amp, 240V, exerciser, 5 year warranty standard $2,064
ZTX04MX60 Automatic Transfer Switch - GE Zenith, 40 amp, 240V, exerciser yes no aux contacts optional any automatic standby generator rated 120/240VAC with 2 wire start control $760
ZTX10MX60 Automatic Transfer Switch - GE Zenith, 100 amp, 240V, exerciser $768
ZTX15MX60 Automatic Transfer Switch - GE Zenith, 150 amp, 240V, exerciser $824
ZTX20MX60 Automatic Transfer Switch - GE Zenith, 200 amp, 240V, exerciser $859
ZTX30MX60 Automatic Transfer Switch - GE Zenith, 300 amp, 240V, exerciser $1,940
ZTX40MX60 Automatic Transfer Switch - GE Zenith, 400 amp, 240V, exerciser $2,007
ZTX-A3A4 Auxiliary Contact Kit - for ZTX series switches, field installable $
OTEC225 Automatic Transfer Switch -Cummins 225A with PowerCommand control, 5 year warranty standard optional optional no any automatic standby generator with 2 wire start control $1,290
free freight
OTEC400 Automatic Transfer Switch -Cummins 400A 240V with PowerCommand control, 5 year warranty standard $1,381
free freight
more Cummins Automatic Transfer Switches -         request quote
ATS2W30 Automatic Transfer Switch - 120VAC, 30A, w/ time delay no no no 120VAC, 30 amp, 3600 watts max, NOTE 2 $81
ATS3W50 Automatic Transfer Switch - 120/240VAC, 50A, w/ time delay 120/240VAC, 50 amp, 12000 watts max, NOTE 2 $190
ATS3W100 Automatic Transfer Switch - 120/240VAC, 100A, w/ time delay 120/240VAC, 100 amp, 24000 watts max, NOTE 2 $649

NOTES:
1) deleted
2) These automatic transfer switches and controllers indicated with NOTE 2 can be used with portable generators or RV generators.  However, for automatic start to work unattended, all functions including the choke must be automatic or not required.  In the case of gasoline fueled engines with manual chokes, we sell a conversion kit to LPG or natural gas which has automatic priming and eliminates the need for the manual choke.  See our LPG03 conversion kit.

 

 


Are YOU ready for the next power outage?

 1 Video Introduction
 2 Outage Archives
 3 Utility Industry
 4 Why You Need Backup
 5 Personal Stories
 6 NoOutage Configurations
 7 Safety
 8 Sizing for Your Needs
 9 Voltage Drop Calculator
10 Test Reports
11 Placing Order
12 Equipment Leasing
13 Books & Videos  
14 Financing
15 Frequently Asked
16 Future Technologies
17 Electricity Glossary
18 Help with Plug Types
19 Who We Are
20 Why Buy Here
21 Our Customers
22 Pick a Contractor
23 Privacy Promise
24 Safe Shopping Guarantee
25 Terms & Conditions
26 What's New
27 Contacting Us
28 Parts Lookup
29 Parts & Service
30 Made in USA
31 Links

We welcome your feedback or questions.  Click here to contact us.
See our Terms & Conditions before using information or ordering from this web site.
Copyright 1999-2016 NoOutage.com LLC.  All rights reserved.