Page last updated Oct 20, 2021 @ 10:08pm

Large Load Banks

 

THIS QUOTE FORM HAS BEEN TEMPORARILY DISCONTINUED AND IS IN THE PROCESS OF BEING REDESIGNED.  PLEASE DO NOT USE AS YOUR REQUEST WILL NOT BE PROCESSED. 

 

 

 

 

 

 

 

 

 

 

 

 

lt-200kw-outdoor-stationary.gif (18808 bytes) lt-255kw-indoor-port.gif (11110 bytes) lt-455kw-indoor-portable.gif (16962 bytes) lt-455kw-outdoor-trailerized.gif (15691 bytes) lt-655kw-indoor-portable.gif (21078 bytes) lt-655kw-outdoor-trailerized.gif (20885 bytes)
200kW          255kW           455kW           455kW           655kW           655kW
click thumbnail image above to enlarge

Large Resistive and
Reactive Load Banks
(over 50kW)

Large load banks are available by special quote and built to your requirements.  These are available as AC or DC resistive, reactive, fixed mounted, trailer mounted or radiator/duct mounted.

To request a quote just indicate your selections on the form below, specify your e-mail address and press the submit button.  You can expect a reply within one business day and the quote shortly thereafter.

[FrontPage Save Results Component]

Load Bank Quote Request Form
Note that fields other than drop-down lists are free-format which means you can enter any combination of values or text as necessary.  You will need to enter something in all fields except those labeled optional.  Some versions of Netscape do not show all the fields which prevents you from completing and submitting the form.  If you don't see all the fields switch to Internet Explorer or send us an e-mail message containing all the information to obtain a quote.  We are working on fixing this problem.  Sorry for any inconvenience.

1. Load Bank Type:
2. Voltage:
3. Phases:
4. Mounting:
5. Capacity (kW or kVAr):
6. Minimum Load Step (kW or kVAr):
7. Location:
8. Cooling (by air or water):
Note that water cooled units are smaller, lighter and have a quicker delivery schedule.
9. Options (for multiple selections hold down Ctrl key):
10. Quantity to be ordered at one time:
11. Types of Equipment that Load Bank will be used to test:
12. Is this a new application or replacement of an existing Load Bank?
13. What is required installation date?
14. Project Installation & Completion Certainty:
15. Comments & Other Requirements:
16. Ship To Location (City, State Zip):
17. Your Name:
18. Your Title:
19. Company:
20. Street:
21. City, State Zip
22. Phone:
23. Your E-mail Address:
24. Enter Security Code: 

If a thank you screen doesn't appear after pressing the Submit button below send us an e-mail message.

 

 


Are YOU ready for the next power outage?

 1 Videos
 2 Outage Archives
 3 Utility Industry
 4 Why You Need Backup
 5 Personal Stories
 6 NoOutage Configurations
 7 Safety
 8 Sizing for Your Needs
 9 Voltage Drop Calculator
10 Test Reports
11 Placing Order
12 Equipment Leasing
13 Books & Videos  
14 Financing
15 Frequently Asked
16 Future Technologies
17 Electricity Glossary
18 Help with Plug Types
19 Who We Are
20 Why Buy Here
21 Our Customers
22 Pick a Contractor
23 Privacy Promise
24 Safe Shopping Guarantee
25 Terms & Conditions
26 What's New
27 Contacting Us
28 Parts Lookup
29 Parts & Service
30 Made in USA
31 Links

We welcome your feedback or questions.  Click here to contact us.
See our Terms & Conditions before using information or ordering from this web site.
Copyright © 1999-2023 NoOutage.com LLC.  All rights reserved.