Page last updated Oct 20, 2021 @ 10:14pm
OTEC125
Automatic Transfer Switch
125 amp 3 pole
with PowerCommand® microprocessor control
The OTEC Open Transition Transfer Switch by Cummins Power Generation provides dependable load transfer for emergency and standby applications. Featuring an easy-to-use microprocessor-based control panel, this switch provides reliable and cost-effective load transfer between a utility service and generator set.
Standard Features
* Open transition load transfer with selectable phase check or programmed transition.
* 3-phase voltage sensing on the normal source; single phase sensing on the generator.
* Front panel indicators and push buttons for ease of set-up.
* Simple-to-read control panel that features universal symbols for easy status recognition.
* Adjustable time delays.
* Integral exerciser clock.
* UL/NEMA 1 indoor enclosure.
* UL Listed and CSA Certified.Optional Features
* Service entrance rated disconnect
* Fully programmable exerciser clock.
* Elevator signal relay.
* Battery chargers.
* UL/NEMA 3R, 4, 12 enclosures.Single Phase
Cummins OTEC 125A and 225A 3 phase switches can be reconfigured in the field by the user for single phase by modifying settings on the controller.
Specs
Switch Current Rating | 125 amps | ||
Poles | 3 pole with solid neutral | ||
Voltage Rating | 600Vac maximum | ||
Transfer Time | 6 cycles max at 60Hz with nominal voltage applied to actuator (without delayed transition enabled) | ||
Operating Temperature | -22F to +140F (-30C to +60C) | ||
Operating Humidity | 95% relative humidity, non-condensing | ||
Altitude | up to 10,000 feet without derating | ||
Control Features (see notes
below) All setting adjustments are made by moving a slide switch on the back of the controller and using the touch pad on the front of the controller while observing the LEDs. Detailed instructions contained in Owner Manual section 7.3.2. KEY: P.U. = pickup D.O. = dropout |
Function | Adjustable Range | Factory Setting |
start time delay1 | 0-10 sec adj | 3 sec | |
transfer time delay2 | 0-300 sec adj | 5 sec | |
retransfer time delay3 | 0-30 minutes adj | 10 minutes | |
stop/cool down delay4 | 0-30 minutes adj | 10 minutes | |
neutral position delay (600A switch & above) |
0-64 sec | 10 sec | |
under voltage sensing of utility5 | 70-90% D.O. adj 90-95% P.U. adj |
85% D.O. 90% P.U. |
|
frequency sensing of utility | --- | --- | |
voltage sensing of generator (1 leg) | 75% D.O. 90% P.U. |
||
frequency sensing of generator | 75% D.O. 90% P.U. |
||
generator test | with or without load | without | |
generator exercise | with or without load 7-28 days |
without 28 days |
|
Options Included | - 2 amp battery charger - Two contacts (one for each source) are provided for customer use. Wired to terminal block for easy access. Rated at 10A continuous and 250 Vac maximum. |
||
Other Options Available at additional cost (partial listing) |
- 40A, 70A, 125A, 150A, 225A,
260A, 300A, 400A, 600A, 800A, 1000A ratings - 120VAC through 600VAC - 4 pole with switched neutral - 50Hz - 3 phase 3 wire or 4 wire - type 3R, 4, 12 enclosures - service entrance rated disconnect (through 800A) |
||
Lug Capacities | see spec sheet above | ||
Enclosure | UL type 1 indoor (types 3R, 4, 12 optional) | ||
Nominal Dimensions (H x W x D) | see spec sheet above | ||
Weight | see spec sheet above |
NOTES:
1The start time delay prevents nuisance generator starts during momentary utility power variations.
2Transfer time delay allows generator set to stabilize before load is applied.
3Retransfer delay prevents needless power interruption if return of utility power is momentary.
4Stop delay allows gradual generator set cool down.
5Undervoltage sensing of utility supply provides reliable starting of generator set during brownout conditions.This switch is available with service entrance rating as an optional adder. Without this option you normally will need a service entrance rated disconnect between this switch and your power company meter.
Item Number: OTEC125
Price: $1,864
Price last updated 3/20/2024
Shipping Weight: 82 lbs.
This item normally ships in approximately 8 weeks or less.
Are YOU ready for the next power outage?
We welcome your feedback or questions. Click here to contact us.
See our Terms & Conditions before using information or
ordering from this web site.
Copyright © 1999-2023 NoOutage.com LLC. All rights reserved.